From the first sketch to the final fitting.
Residential, hospitality, and commercial interiors, designed, built, and finished by a single team, with joinery made in-house.
Nothinggets lost in thehandover.
Three disciplines, one team, one line of accountability, so quality holds from concept to the final fitting.
Three studios. One programme.
A studio built over fourteen years.
Numbers measure the boundary, not the work. They still help when introductions are short.
Marsa House
A coastal villa for a family of five — quartersawn oak floors, travertine baths, and a kitchen built entirely in our workshop.
- 2025
- New Cairo
- 740 m²
From first brief to twelve-month defect cover.
Brief
Site visit, brief workshop, fee letter. Two weeks.
Design
Concept, scheme, technical packs and samples. 4–8 weeks.
Material
Sourcing, prototyping in our workshop, sign-off. 2–4 weeks.
Build
Site set-up, MEP, finishes, joinery installation. 6–16 weeks.
Handover
Snag, deep-clean, photography, 12-month defects cover.
Spaces we’ve delivered.
Residential, hospitality, administrative, and commercial spaces designed, built, and finished by Stallion.
Trusted acrossEgypt’s developments.
Our work sits inside some of Egypt’s most established addresses
Close enoughto be on site.✦ Operating across Cairo, Giza, Red Sea, and the North Coast — present where it matters. ✦
Atelier Nile
A river-facing restaurant clad in burnt-oak panels, with a brass-railed mezzanine.
- 2024
- Zamalek, Cairo
- 310 m²
A selection.
What our clients say after handover.
They quoted us a fit-out and ended up building our furniture, kitchen, and our team's offices in three other cities. The relationship runs deeper than a contract.
Site programme held to the day. I've worked with a lot of contractors. This is different.
Their workshop is the reason the kitchen took six weeks instead of six months. Everything we drew, they made.
Eighty-two percent of our timber is from FSC-certified mills. We're working on the rest.
We measure waste in cubic metres per project, audit our suppliers' chain-of-custody annually, and design joinery to be re-finished rather than replaced. Sustainability shouldn't be a cover-line. It's the way drawings get made.
Notes from the studio.
Start your project with one team.
Send a floor plan, a moodboard, or just a few sentences. We respond within two working days with a feasibility note and a fee letter.
