Skip to content
Stallion
From the first sketch to the final delivery.

From the first sketch to the final fitting.

Residential, hospitality, and commercial interiors, designed, built, and finished by a single team, with joinery made in-house.

Scroll
Manifesto

Nothinggets lost in thehandover.

Three disciplines, one team, one line of accountability, so quality holds from concept to the final fitting.

Cairo · Mohandseen
By the numbers

A studio built over fourteen years.

Numbers measure the boundary, not the work. They still help when introductions are short.

14
Years
187
Projects delivered
92K
Square metres built
64
Craftspeople
Featured projectAll projects →
Marsa House
Residential · Villa

Marsa House

A coastal villa for a family of five — quartersawn oak floors, travertine baths, and a kitchen built entirely in our workshop.

Year
2025
Location
New Cairo
Area
740 m²
Read case study
Process

From first brief to twelve-month defect cover.

Brief

Site visit, brief workshop, fee letter. Two weeks.

Design

Concept, scheme, technical packs and samples. 4–8 weeks.

Material

Sourcing, prototyping in our workshop, sign-off. 2–4 weeks.

Build

Site set-up, MEP, finishes, joinery installation. 6–16 weeks.

Handover

Snag, deep-clean, photography, 12-month defects cover.

OUR CLIENTS

Trusted acrossEgypt’s developments.

Our work sits inside some of Egypt’s most established addresses

Client logos coming soon
OUR REACH

Close enoughto be on site.✦ Operating across Cairo, Giza, Red Sea, and the North Coast — present where it matters. ✦

14cities
187projects
92Km² built
14years
Featured projectAll projects →
Atelier Nile
Hospitality · Restaurant

Atelier Nile

A river-facing restaurant clad in burnt-oak panels, with a brass-railed mezzanine.

Year
2024
Location
Zamalek, Cairo
Area
310 m²
Read case study
Voices

What our clients say after handover.

"
They quoted us a fit-out and ended up building our furniture, kitchen, and our team's offices in three other cities. The relationship runs deeper than a contract.
Y. ElSayed
Founder · hospitality group
"
Site programme held to the day. I've worked with a lot of contractors. This is different.
M. Hashem
Project director
"
Their workshop is the reason the kitchen took six weeks instead of six months. Everything we drew, they made.
Studio Lina
Architects
As seen in
IdentityArchitectural ReviewDezeenCairo Design WeekWallpaper*Frame
S U S T AI N A BI L I T Y

Eighty-two percent of our timber is from FSC-certified mills. We're working on the rest.

We measure waste in cubic metres per project, audit our suppliers' chain-of-custody annually, and design joinery to be re-finished rather than replaced. Sustainability shouldn't be a cover-line. It's the way drawings get made.

FSC timber
82%
Waste/m³
-38%
Re-finish rate
91%
FSC-certified European oak timber
FSC · Quartersawn European oak · 82% audited
S TART A PROJECT

Start your project with one team.

Send a floor plan, a moodboard, or just a few sentences. We respond within two working days with a feasibility note and a fee letter.

Stallion